Tuesday 21 August 2012

South West Showcase Sculpture (un-named)




The formers finished ready for the veneers.
Tension straps where attached to put pressure around the curve and also I needed to protect the veneer from marking. I made a pine chock to slip underneath the end of tension strap. Not sure that worked well as it gave me a point of low pressure once in the vacuum bag and consequently a small point where the veneers did not come together as would have liked.

No comments:

Post a Comment